PROJECT REFRENCES

SL.NO

PROJECT

YEAR

LOCATION

SCOPE

CONTRACT VALUE

1

Up gradation of Existing supervisory system in Swaihat power station

2011/12

Abu Dhabi

1)Metering panel replacement .
2) Flow computer installation
3)UPS power supply installation for the flow computer.
4)Cable laying, glanding and termination
5)Fiber cabling and splicing, termination and testing works

AED 200,000.00

2

TDG Substation 2006-2008 at GLF

2011/12

Dubai

GIS installation, cable termination , testing and commissioning assistance

AED 460,000.00

3

Fiber optic splicing, Termination and testing works HRS pipe line project

2012/2013

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

AED 15,000.00

4

LV &MV Termination works for Shah Gas development

2013

Abu Dhabi

LV and MV cable splicing and termination works

AED 15,000.00

5

400 KV Substation at Asab and Shah gas development

2013

Shah/ASAB

MV switch Gear installation, cable termination , testing and commissioning assistance

AED 120,000.00

6

SGD -05 Gas pipe line prjoect Fiber optical works

2013

Shah/Hafsan

Fiber cable splicing, termination and testing

AED 150,000.00

7

Spare Gas Chromatograph Installation works

2013

DUBAI/DUBAL

Installation of GC including shelter works, Cabling, Fiber splicing and termination, Control panel modification, Tubing and pre commissioning works.

AED 75,000.00

8

HRS Glanding and Termination works skilled resources supply

2013

Hafsan/Ruwais

Cable glanding, termination and testing

AED 150,000.00

9

Gas Chromatograph Installation works at DEWA

2013

DUBAI/DEWA

Installation of GC including shelter works, Cabling, flow computer installation, Field instruments installation, Tubing and pre commissioning works

AED 55,000.00

10

Fire Alarm system replacement works at suction valve stations at Maqta Taweelah pipe line

2013

Abu Dhabi/Dolphin Energy

Replacement of Fire Alarm panel, MCP, Smoke detector, Beacon and sounders in Hazardous area.

AED 25,000.00

11

Solar Battery replacement, testing and commissioning works

2013

Abu Dhabi/Dolphin Energy

Replacement of batteries, testing and commissioning including old battery disposal.

AED 36,000.00

12

Fiber optic splicing, Termination and testing works at Shah gas development project

2013

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

AED 63218.00

13

Supply and installation of all mechanical spools and electrical and instrumentation works for Gas Metering system at Umal Nar Refinery at Sas Al Nakhil Island

2013

Umal Nar Refineray/Arabian power company

Detail engineering, Supply and installation of new upstream and downstream spool pieces and GASCO Tie in. PT and TT supply and installation. FMC flow meter and flow computer installation and cabling of the complete metering system

AED 94000.00

14

Shah Gas Developments (Package 2 & 3) Project

2013

Shah

Installation of cable tray and supports

AED 522000.00

15

Fiber optic splicing, Termination and testing works at Shah gas development project

2013

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

AED 166727.00

16

EPC for Shah Gas Gathering project

2013

Shah

Fiber optical splicing, termination and OTDR testing works

AED 97920.00

17

Control panel modification at Takreer Refinary

2013

Ruwais

Control panel modification works and cable glanding and termination.

AED 12000.00

18

Civil works for EMAL filtration system black powder management project

2014

EMAL/Tawellah

Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works

AED 315000.00

19

Gas Chromatograph Installation works at Dolphin Energy

2014

DUBAI/DEWA

Services rendered towards:

  1. Removal & reinstallation of Gas Chromatograph
  2. Reworking & reinstallation tubing work
  3. Supply of SS tubing
  4. Supply of manpower support
  5. Transport rental within CNIA area

USD 12,820.00

20

SHAH - Gas Gathering Project

2014

Shah Gas

Fiber splicing, termination and testing works.

AED 106320.00

21

Civil works for EMAL filtration system black powder management project

2014

EMAL/Tawellah

Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works

AED 472530.00

22

SHAH - Gas Gathering Project

2014

Shah Gas

Fiber splicing, termination and testing works.

AED 240960.00

23

Passive Shelter cooling coil replacement works at 4 SV stations at Dolphin energy.

2014

Abu Dhabi/Dolphin Energy

Replacement of Cooling coil and glycol and demineralized water replacement works at 4 No of passive shelters at Dolphin energy SV stations

AED 108,000.00

24

EPC for Shah Gas Gathering project

2014

Shah

Fiber optical splicing, termination and OTDR testing works

AED 217968.00

25

Fiber optic splicing, Termination and testing works at Abu Dhabi Airport Mid Field Terminals

2014

Abu Dhabi

Fiber optical splicing, termination and OTDR testing works

AED 50000.00

26

EPC for Shah Gas Gathering project

2014

Shah

Fiber optical splicing, termination and OTDR testing works

AED 59166.00

27

Gas Chromatograph up gradation project

2014

OMAN

Supply of all accessories to upgrade GC system.
Supply includes NRV’s, Filters, Flow meters, Sampling system Skid, Heated regulator.
The installation includes only the preparation of Skid and delivery of the same with proper packing.

AED 157,000.00

28

Supply, Installation and commissioning of SMATV

2014

Zirku Island

Supply and installation and commissioning of SMAT TV system at ZADCO- Zirku Island.

65479.00

29

GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal E& I Works

2014

Habshan

The scope of work include the supply of Exd JB’s and tubing and cables.
The installation scope covers cabling and tubing installation of JB’s, supports, glanding and termination works for 4 dry gas skids. 

325000.00

30

GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works

2014

Habshan

Excavation of 4 no of Heater cable trench/Branch cable trench for the skid/Heater panel foundation for Skid including concrete surface core cutting, demolition of concrete, preparation of trench by opening the existing trench
Supply and installation of all materials for foundation for the heater panel as per GASCO requirement

295000.00

31

EPC Work for Additional NGV filling stations.

2014

Abu Dhabi

Engineering and construction for 13 no of NGV station in the existing ADNOC station and 1 new mother station at Al Faqqa- Al Ain

1100000.00

32

GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works

2014

Habshan

Supply of materials and modification of existing MCC panel to match the heater panel power requirement including protection facilities as per GASCO requirements

84000.00

33

NGV filling Station Phase II

2014

Ruwaise /Al Ain

Supply and installation of Raised Floor for E&I Room.

127000.00