SL.NO |
PROJECT |
YEAR |
LOCATION |
SCOPE |
CONTRACT VALUE |
1 |
Up gradation of Existing supervisory system in Swaihat power station |
2011/12 |
Abu Dhabi |
1)Metering panel replacement .
2) Flow computer installation
3)UPS power supply installation for the flow computer.
4)Cable laying, glanding and termination
5)Fiber cabling and splicing, termination and testing works |
AED 200,000.00 |
2 |
TDG Substation 2006-2008 at GLF |
2011/12 |
Dubai |
GIS installation, cable termination , testing and commissioning assistance |
AED 460,000.00 |
3 |
Fiber optic splicing, Termination and testing works HRS pipe line project |
2012/2013 |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
AED 15,000.00 |
4 |
LV &MV Termination works for Shah Gas development |
2013 |
Abu Dhabi |
LV and MV cable splicing and termination works |
AED 15,000.00 |
5 |
400 KV Substation at Asab and Shah gas development |
2013 |
Shah/ASAB |
MV switch Gear installation, cable termination , testing and commissioning assistance |
AED 120,000.00 |
6 |
SGD -05 Gas pipe line prjoect Fiber optical works |
2013 |
Shah/Hafsan |
Fiber cable splicing, termination and testing |
AED 150,000.00 |
7 |
Spare Gas Chromatograph Installation works |
2013 |
DUBAI/DUBAL |
Installation of GC including shelter works, Cabling, Fiber splicing and termination, Control panel modification, Tubing and pre commissioning works. |
AED 75,000.00 |
8 |
HRS Glanding and Termination works skilled resources supply |
2013 |
Hafsan/Ruwais |
Cable glanding, termination and testing |
AED 150,000.00 |
9 |
Gas Chromatograph Installation works at DEWA |
2013 |
DUBAI/DEWA |
Installation of GC including shelter works, Cabling, flow computer installation, Field instruments installation, Tubing and pre commissioning works |
AED 55,000.00 |
10 |
Fire Alarm system replacement works at suction valve stations at Maqta Taweelah pipe line |
2013 |
Abu Dhabi/Dolphin Energy |
Replacement of Fire Alarm panel, MCP, Smoke detector, Beacon and sounders in Hazardous area. |
AED 25,000.00 |
11 |
Solar Battery replacement, testing and commissioning works |
2013 |
Abu Dhabi/Dolphin Energy |
Replacement of batteries, testing and commissioning including old battery disposal. |
AED 36,000.00 |
12 |
Fiber optic splicing, Termination and testing works at Shah gas development project |
2013 |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
AED 63218.00 |
13 |
Supply and installation of all mechanical spools and electrical and instrumentation works for Gas Metering system at Umal Nar Refinery at Sas Al Nakhil Island |
2013 |
Umal Nar Refineray/Arabian power company |
Detail engineering, Supply and installation of new upstream and downstream spool pieces and GASCO Tie in. PT and TT supply and installation. FMC flow meter and flow computer installation and cabling of the complete metering system |
AED 94000.00 |
14 |
Shah Gas Developments (Package 2 & 3) Project |
2013 |
Shah |
Installation of cable tray and supports |
AED 522000.00 |
15 |
Fiber optic splicing, Termination and testing works at Shah gas development project |
2013 |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
AED 166727.00 |
16 |
EPC for Shah Gas Gathering project |
2013 |
Shah |
Fiber optical splicing, termination and OTDR testing works |
AED 97920.00 |
17 |
Control panel modification at Takreer Refinary |
2013 |
Ruwais |
Control panel modification works and cable glanding and termination. |
AED 12000.00 |
18 |
Civil works for EMAL filtration system black powder management project |
2014 |
EMAL/Tawellah |
Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works |
AED 315000.00 |
19 |
Gas Chromatograph Installation works at Dolphin Energy |
2014 |
DUBAI/DEWA |
Services rendered towards:
- Removal & reinstallation of Gas Chromatograph
- Reworking & reinstallation tubing work
- Supply of SS tubing
- Supply of manpower support
- Transport rental within CNIA area
|
USD 12,820.00 |
20 |
SHAH - Gas Gathering Project |
2014 |
Shah Gas |
Fiber splicing, termination and testing works. |
AED 106320.00 |
21 |
Civil works for EMAL filtration system black powder management project |
2014 |
EMAL/Tawellah |
Complete civil works for EMAL filter replacement project including procurement and construction which include foundation for filters, pipe slippers, miscellaneous civil works |
AED 472530.00 |
22 |
SHAH - Gas Gathering Project |
2014 |
Shah Gas |
Fiber splicing, termination and testing works. |
AED 240960.00 |
23 |
Passive Shelter cooling coil replacement works at 4 SV stations at Dolphin energy. |
2014 |
Abu Dhabi/Dolphin Energy |
Replacement of Cooling coil and glycol and demineralized water replacement works at 4 No of passive shelters at Dolphin energy SV stations |
AED 108,000.00 |
24 |
EPC for Shah Gas Gathering project |
2014 |
Shah |
Fiber optical splicing, termination and OTDR testing works |
AED 217968.00 |
25 |
Fiber optic splicing, Termination and testing works at Abu Dhabi Airport Mid Field Terminals |
2014 |
Abu Dhabi |
Fiber optical splicing, termination and OTDR testing works |
AED 50000.00 |
26 |
EPC for Shah Gas Gathering project |
2014 |
Shah |
Fiber optical splicing, termination and OTDR testing works |
AED 59166.00 |
27 |
Gas Chromatograph up gradation project |
2014 |
OMAN |
Supply of all accessories to upgrade GC system.
Supply includes NRV’s, Filters, Flow meters, Sampling system Skid, Heated regulator.
The installation includes only the preparation of Skid and delivery of the same with proper packing. |
AED 157,000.00 |
28 |
Supply, Installation and commissioning of SMATV |
2014 |
Zirku Island |
Supply and installation and commissioning of SMAT TV system at ZADCO- Zirku Island. |
65479.00 |
29 |
GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal E& I Works |
2014 |
Habshan |
The scope of work include the supply of Exd JB’s and tubing and cables.
The installation scope covers cabling and tubing installation of JB’s, supports, glanding and termination works for 4 dry gas skids. |
325000.00 |
30 |
GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works |
2014 |
Habshan |
Excavation of 4 no of Heater cable trench/Branch cable trench for the skid/Heater panel foundation for Skid including concrete surface core cutting, demolition of concrete, preparation of trench by opening the existing trench
Supply and installation of all materials for foundation for the heater panel as per GASCO requirement |
295000.00 |
31 |
EPC Work for Additional NGV filling stations. |
2014 |
Abu Dhabi |
Engineering and construction for 13 no of NGV station in the existing ADNOC station and 1 new mother station at Al Faqqa- Al Ain |
1100000.00 |
32 |
GASCO Habshan NP 96C-101,102/ 97C-101/102 Retrofit Project - Tandem L Dry Gas Seal Civil Works |
2014 |
Habshan |
Supply of materials and modification of existing MCC panel to match the heater panel power requirement including protection facilities as per GASCO requirements |
84000.00 |
33 |
NGV filling Station Phase II |
2014 |
Ruwaise /Al Ain |
Supply and installation of Raised Floor for E&I Room. |
127000.00 |